ANALISIS PRODUKTIVITAS TENAGA KERJA DENGAN PENDEKATAN WORK SAMPLING DAN TIME STUDY PADA PROSES PRODUKSI SARUNG TANGAN DI CV. CAHAYA SETIA MULIA ABADI

Authors

  • Achmad Tazaki Al Mamtuh Universitas Teknologi Yogyakarta
  • Widya Setiafindari Universitas Teknologi Yogyakarta

DOI:

https://doi.org/10.61722/jipm.v4i4.2693

Keywords:

Labor Productivity, Work Sampling, Time Study, Motion Study, SOP, Golf Gloves Production.

Abstract

Labor productivity is an important factor that affects the effectiveness and efficiency of production processes in manufacturing companies. At CV. Cahaya Setia Mulia Abadi, several non-productive activities were identified, such as waiting for materials, chatting, searching for work tools, using mobile phones, and being idle, which potentially reduce production performance. In addition, inefficient work movements were also found, causing wasted time and labor. This study aims to determine the level of labor productivity, analyze work activities using the work sampling and time study methods, provide improvement recommendations, and analyze work movements through motion study to develop a new Standard Operating Procedure (SOP) as an effort to improve work efficiency. The methods used in this research include work sampling to measure the proportion of productive and non-productive activities, time study to determine the standard production time, fishbone diagram and 5W+1H analysis to identify the root causes of inefficiency, and motion study to evaluate operator work movements. The results showed that the average production achievement reached 104.96% of the company’s target. Based on work sampling observations of 100 work activities, 88% were productive activities and 12% were non-productive activities. The time study results showed that the total standard time for the glove production process was 958.29 seconds or 15.97 minutes. The motion study analysis indicated that there were still several non-value-added movements, such as repeated tool retrieval and inefficient work transitions. Therefore, improvement proposals were made through simplification of work methods and the preparation of a new SOP to improve labor productivity and work efficiency sustainably.

Keywords: Labor Productivity, Work Sampling, Time Study, Motion Study, SOP, Golf Gloves Production.

References

Agustina, A., & Mardalis, A. (2024). Pengaruh Kerja Paruh Waktu, Motivasi Belajar Dan Time Management Terhadap Prestasi Akademik (Studi Kasus Pada Mahasiswa Bekerja Part Time). 17(2). https://doi.org/10.46306/jbbe.v17i2

Anggraini, R., Laorenza, S., Muhammad, ;, & Adelino, I. (2022). Analisis Pengukuran Waktu Kerja Secara Langsung Dengan Metode Work Sampling Pada UMKM Soerabi Bandung. Jurnal Jurnal Sains Dan Teknologi (JSIT), 2(3), 161–167. https://doi.org/10.47233/jsit.v2i3

Ashley, B. A., Mahachandra, M., & Korespondensi, P. (2022). Penentuan Jumlah Tenaga Kerja Optimal Berdasarkan Waktu Baku Dengan Metode Work Sampling Pada Stasiun Kerja Scouring-Bleaching ( Studi Kasus : PT XYZ ).

Benazir Anjani. (2023). Analisis Produktivitas Kerja Menggunakan Metode Work Sampling Serta Evaluasi Lingkungan Kerja Fisik Pada Dakota Rumah Konveksi.

Dwipurwanto, B. (2023). Analisis Produktivitas Tenaga Kerja Pemasangan Dinding Bata Ringan Dengan Metode Work Sampling Pada Pembangunan Rusun Surabaya. INTER TECH, 1(1), 22–27. https://doi.org/10.54732/i.v1i1.1021

Ekowati, D., & Subekti, I. (2022). Analisis Beban Kerja Dan Kebutuhan Tenaga Prabubakti Dengan Metode Work Sampling Dan Metode Workload Indicator Staff Needes. Kajian Ekonomi Dan Bisnis, 17(1), 31–44. https://doi.org/10.51277/keb.v17i1.116

Elok Sekarningsih, P., Fashanah Hadining, A., Karawang Jl HSRonggo Waluyo, S., Timur, T., & Karawang, K. (2022). Analisis Pengukuran Kerja Dalam Menentukan Waktu Baku Pada Operator Mesin Broaching Dengan Metode Pengukuran Waktu Jam Henti (Studi Kasus: PT XYZ). In Jurnal Teknik Industri (Vol. 8, Number 2).

Ernawati, R., Fauziyyah, L. H., & Widhiarso, W. (2022). Penentuan Jumlah Tenaga Kerja Optimal berdasarkan Beban Kerja Pada PT X.

Febriani, V., & Susanty, A. (2022). Pengukuran Beban Kerja dan Penentuan Jumlah Tenaga Kerja Optimal Menggunakan Metode Work Load Analysis (WLA) Pada Bagian Packing Divisi Kacang Atom (Studi Kasus: PT Dua Kelinci).

Lalujan, A. N., & Sutandi, D. A. (2024). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Penulangan Di Kota Manado Dengan Metode Work Sampling. In JMTS: Jurnal Mitra Teknik Sipil (Vol. 5, Number 3).

Liespono, A., & Tjendani, H. T. (2023). Analisis Produktivitas Tenaga Kerja Dengan Metode Work Sampling Pada Proyek Pembangunan Perumahan Pakuwon City Surabaya. Journal of Scientech Research and Development, 5(2). https://idm.or.id/JSCR/inde

Miranda Sianturi, & Ade Yanyan Ramdhani. (2026). Strategi Peningkatan Produktivitas Operator Melalui Analisis Metode Time Study Pada Proses Pengemasan Produk(Studi Kasus : PT. Dion Farma Abadi Klaten, Jawa Tengah). WALUYO JATMIKO PROCEEDING, 18(1), 132–144. https://doi.org/10.33005/wj.v18i1.154

Nurhidayat, A., Hisyam Faiz, M., Rifqi, M., Prasetiyo Wibowo, A., Muzaki, R., Raihan Asworo, H., Zulkarnaen, I., & Barita Maniur Tambunan, E. (2024). Implementasi Metode Work Sampling untuk Mengidentifikasi dan Mengurangi Aktivitas Non-Produktif di Kantin Katsu Universitas Bhanyangkara Jakarta Raya. Journal of Engineering Environment Energy and Science, 3(2). http://ejurnal.ubharajaya.ac.id/index.php/joeees85

Paulus Atanay, O. (2022). Produktivitas Kerja Pada Pelayanan Tiket Di PT. PELNI SORONG Dengan Metode Stopwatch Time Study. In Metode Jurnal Teknik Industri (Vol. 8, Number 2).

Putra, I. B., & Hardiansyah, M. faizal. (2022). Analisa Beban Kerja Menggunakan Work Sampling Dan Nasa Tlx Untuk Menentukan Jumlah Operator Bagian Work Caging.

Raodah, R., Aqsha, I., Husda, B. R., Ramdhani, I., & Erniyani, E. (2025). Analisis Produktivitas Penjahit dengan Menggunakan Metode Work Sampling. Jurnal Teknik Industri Terintegrasi, 8(3), 3202–3211. https://doi.org/10.31004/jutin.v8i3.48400

Rusdianto, S., Hanagari, L., Herry Purnomo, B., Bagus Suryaningrat, I., Wibowo, Y., Setiawan Rusdianto, A., Studi Teknologi Industri Pertanian, P., & Teknologi Pertanian, F. (2022). Penentuan Jumlah dan Efisiensi Tenaga Kerja Pengemasan Dengan Metode Work Sampling Determination The Number and Efficiency of Labor at the Packaging by Using Work Sampling Method. In JOFE : Journal of Food Engineering | E-ISSN (Vol. 1, Number 3).

Septiani, N. U., & Nurbani, S. N. (2024). Penggunaan Metode Work Sampling Untuk Menganalisis Produktivitas Tenaga Kerja Operator Sewing Di CV ABC.

Siswiyanti, & Nusantara, A. R. (2022). Analisis Waktu Standar Produksi naple Pada Bagian Pembubutan Dan Pemotongan Dengan Metode Work Sampling.

Sutiko, A., Suprapto, H., & Zainuddin, D. (2021). Analisis Produktivitas dan Beban Kerja Operator Produksi dengan Metode Work Sampling dan NASA-TLX di PT. Tokai Dharma Indonesia Plant II. Jurnal Optimasi Teknik Industri (JOTI), 3(2), 49. https://doi.org/10.30998/joti.v3i2.10026

Downloads

Published

2026-06-30

How to Cite

Achmad Tazaki Al Mamtuh, & Widya Setiafindari. (2026). ANALISIS PRODUKTIVITAS TENAGA KERJA DENGAN PENDEKATAN WORK SAMPLING DAN TIME STUDY PADA PROSES PRODUKSI SARUNG TANGAN DI CV. CAHAYA SETIA MULIA ABADI . JURNAL ILMIAH PENELITIAN MAHASISWA, 4(4), 398–410. https://doi.org/10.61722/jipm.v4i4.2693

Issue

Section

##section.default.title##